Colorado Warehouse Projects: Real Case Studies & Results

See quantified results from 5 recent Colorado warehouse projects across aerospace, food distribution, automotive, electronics, and brewing industries. Projects span Denver metro, Boulder County, Colorado Springs, and Fort Collins with proven ROI and measurable improvements.

5
Projects Completed
98.8%%
Avg Storage Increase
$0K
Annual Savings
11.4
Avg ROI (months)

Denver Aerospace Manufacturing Facility Expansion

Aurora, ColoradoAerospace Manufacturing

Project Type: High-Bay Storage ExpansionCompleted: March 2024Duration: 6 weeks
Investment
$385,000
ROI: 18 months

Project Impact

+73%
Storage Capacity Increase
45,000 pallet positions78,000 pallet positions
$165K/year
Annual Cost Savings
$485K annual warehouse costs$320K annual warehouse costs
+39%
Operational Efficiency
2.3 hours pick time1.4 hours pick time

Project Overview

Complete redesign of 180,000 sq ft aerospace parts warehouse to accommodate increased production demands while maintaining strict quality and security requirements. Project included installation of 35-foot high selective pallet racking with specialized anti-static features for sensitive electronic components.

Challenge

Client needed to triple storage capacity within existing facility footprint while maintaining aerospace industry compliance (AS9100) and implementing automated inventory tracking. Previous racking system couldn't support the weight requirements for titanium alloy storage.

Solution

Designed and installed heavy-duty structural steel racking system with 8,000 lb beam capacity, integrated RFID tracking compatibility, and specialized grounding systems for ESD protection. Implemented narrow-aisle configuration with wire guidance to maximize density.

Project Specifications

Facility Size:180,000 sq ft
Client:Mountain West Aerospace
Industry:Aerospace Manufacturing

Equipment Used

  • 450 frames of 42' H x 48' W structural uprights
  • 1,200 pairs of 8,000 lb capacity W6x15 beams
  • Anti-static wire decking with grounding strips
  • Column guards and end-of-aisle protection
  • LED bay lighting integrated with rack structure

Quantified Results

Storage Density Improvement
From 250 pallets/1000 sqft to 433 pallets/1000 sqft
73%
Pick Accuracy Increase
Reduced errors from 1.8% to 0.3%
99.7%
Labor Cost Reduction
Annual savings through improved efficiency
$165K
Installation Timeline
Completed 2 weeks ahead of schedule
6 weeks
"PRLwarehouse delivered exactly what we needed - a system that could handle our specialized requirements while dramatically increasing our storage capacity. The project was completed on time and the quality exceeded our expectations."
Sarah Chen
Facilities Director, Mountain West Aerospace

Boulder County Food Distribution Center

Longmont, ColoradoFood Distribution

Project Type: Cold Storage OptimizationCompleted: November 2023Duration: 4 weeks
Investment
$195,000
ROI: 14 months

Project Impact

+74%
Storage Capacity Increase
12,500 pallet positions21,800 pallet positions
$38K/year
Annual Cost Savings
$180K annual energy costs$142K annual energy costs
+50%
Operational Efficiency
4.2 hours loading time2.1 hours loading time

Project Overview

Complete retrofitting of 95,000 sq ft refrigerated warehouse to accommodate growing regional food distribution needs. Project focused on maximizing storage density while maintaining proper air circulation and temperature control in freezer (-10°F) and cooler (34°F) environments.

Challenge

Existing drive-in racking was inefficient and created temperature inconsistencies. Client needed FIFO rotation capability for perishable goods and better accessibility for order picking while working within the constraints of an existing refrigerated building.

Solution

Replaced drive-in system with selective pallet racking optimized for cold storage. Implemented specialized galvanized finish to prevent corrosion, integrated with existing sprinkler and air circulation systems, and designed aisles for reach truck operation in confined spaces.

Project Specifications

Facility Size:95,000 sq ft
Client:Rocky Mountain Foods
Industry:Food Distribution

Equipment Used

  • 285 frames of 28' H selective pallet racking
  • 720 pairs of 3,200 lb capacity teardrop beams
  • Galvanized finish for corrosion resistance
  • Specialized low-temperature wire decking
  • Integrated conveyor support structures

Quantified Results

Storage Efficiency Gain
Increased from 131 to 229 pallets per 1000 sqft
74%
Temperature Consistency
Improved from ±3°F variance
±1°F
Order Picking Speed
Reduced truck loading time by 2.1 hours
+50%
Energy Savings
Annual reduction in refrigeration costs
$38K
"The new racking system transformed our operation. We can store 74% more product in the same space and our energy bills dropped significantly due to better air circulation."
Mike Rodriguez
Operations Manager, Rocky Mountain Foods

Denver Automotive Parts Consolidation

Commerce City, ColoradoAutomotive Distribution

Project Type: Multi-Level Storage SystemCompleted: January 2024Duration: 8 weeks
Investment
$425,000
ROI: 9 months

Project Impact

+86%
Storage Capacity Increase
28,000 SKU positions52,000 SKU positions
$47K/month
Annual Cost Savings
$95K monthly lease costs$48K monthly lease costs
+60%
Operational Efficiency
45 minutes order fulfillment18 minutes order fulfillment

Project Overview

Consolidation of three separate automotive parts warehouses into single 125,000 sq ft facility using advanced multi-level racking system. Project enabled client to reduce real estate costs while improving inventory access and order fulfillment speed for 15,000+ automotive SKUs.

Challenge

Client was operating from three leased facilities across Denver metro area, creating inefficiencies in inventory management and fulfillment. Needed to consolidate operations while maintaining rapid access to fast-moving parts and accommodating parts ranging from small clips to engine blocks.

Solution

Designed hybrid storage system combining selective racking for fast movers, drive-in racking for bulk items, and multi-tier shelving for small parts. Integrated pick modules with conveyor systems and implemented zone-based organization by vehicle make/model.

Project Specifications

Facility Size:125,000 sq ft
Client:Front Range Auto Supply
Industry:Automotive Distribution

Equipment Used

  • 380 frames of variable height selective racking (16'-32')
  • 950 pairs of mixed capacity beams (2,500-6,000 lbs)
  • Multi-tier pick modules with integrated stairs
  • 125 sections of drive-in racking for bulk storage
  • Comprehensive safety equipment and lighting

Quantified Results

Facility Consolidation
Consolidated three warehouses into one
3 to 1
SKU Storage Increase
From 28,000 to 52,000 accessible positions
86%
Order Fulfillment Speed
Reduced from 45 to 18 minutes average
+60%
Monthly Cost Savings
Reduced lease and operating costs
$47K
"PRLwarehouse helped us achieve what seemed impossible - consolidating three warehouses while actually improving our service levels. The ROI was incredible."
Jennifer Walsh
VP of Operations, Front Range Auto Supply

Colorado Springs Electronics Manufacturing

Colorado Springs, ColoradoElectronics Manufacturing

Project Type: Clean Room Compatible StorageCompleted: September 2023Duration: 5 weeks
Investment
$165,000
ROI: 11 months

Project Impact

+114%
Storage Capacity Increase
8,500 component bins18,200 component bins
$23K/year
Annual Cost Savings
$75K inventory carrying costs$52K inventory carrying costs
+73%
Operational Efficiency
15 minutes component retrieval4 minutes component retrieval

Project Overview

Installation of specialized clean room compatible storage system for electronics manufacturing facility producing military-grade components. Project required adherence to ISO 14644 Class 1000 clean room standards while maximizing storage density for sensitive electronic components.

Challenge

Facility needed to expand component storage within existing clean room environment without compromising air quality or contamination control. Previous shelving was inadequate for growing production demands and didn't meet updated military contract requirements for organization and traceability.

Solution

Designed and installed electropolished stainless steel racking system with integrated anti-static features and HEPA-compatible design. Implemented bin-level identification system and created contamination-free access paths for material handling equipment.

Project Specifications

Facility Size:25,000 sq ft
Client:Peak Electronics Corp
Industry:Electronics Manufacturing

Equipment Used

  • 145 sections of electropolished stainless steel racking
  • 480 anti-static component bins with clear lids
  • Clean room compatible leveling feet
  • Integrated label holders for component identification
  • ESD-safe accessories and grounding systems

Quantified Results

Storage Capacity Increase
Doubled available component positions
114%
Clean Room Compliance
Maintained Class 1000 certification
ISO 14644
Component Access Speed
Reduced retrieval time from 15 to 4 minutes
+73%
Inventory Accuracy
Improved from 96.2% with integrated tracking
99.9%
"The attention to clean room requirements was exceptional. We maintained our ISO certification throughout installation and the new system has significantly improved our production efficiency."
Dr. Robert Kim
Manufacturing Director, Peak Electronics Corp

Fort Collins Craft Brewery Expansion

Fort Collins, ColoradoBeverage Manufacturing

Project Type: Barrel Aging and Packaging StorageCompleted: May 2024Duration: 3 weeks
Investment
$145,000
ROI: 5 months

Project Impact

+147%
Storage Capacity Increase
850 barrel positions2,100 barrel positions
$28K/month
Annual Cost Savings
$28K monthly off-site storage$0 off-site storage costs
+66%
Operational Efficiency
3.5 hours barrel rotation1.2 hours barrel rotation

Project Overview

Custom barrel aging storage solution for rapidly growing craft brewery needing to expand barrel-aged beer production. Project included specialized racking for 55-gallon bourbon barrels and temperature-controlled packaging storage for finished products.

Challenge

Brewery was paying premium rates for off-site barrel storage and needed in-house solution that could accommodate barrel aging requirements including easy access for sampling, rotation, and cleaning. Space constraints required vertical storage while maintaining safe access for brewery workers.

Solution

Engineered custom barrel racking system with integrated safety features, specialized cradles for barrel stability, and accessible sampling points. Included separate climate-controlled area for packaging storage with easy forklift access and first-in-first-out flow.

Project Specifications

Facility Size:18,000 sq ft
Client:Mountain Peak Brewing
Industry:Beverage Manufacturing

Equipment Used

  • Custom barrel cradle racking for 2,100 positions
  • Reinforced 20' high structural steel framework
  • Integrated safety railings and access platforms
  • 180 positions of case goods storage racking
  • Climate monitoring integration points

Quantified Results

Barrel Storage Increase
From 850 to 2,100 barrel capacity
147%
Monthly Savings
Eliminated off-site storage costs
$28K
Barrel Handling Efficiency
Reduced rotation time significantly
+66%
Production Capacity
Enabled barrel-aged beer expansion
+180%
"This system paid for itself in 5 months just from eliminating off-site storage costs. The custom barrel racking is exactly what we needed to scale our barrel-aged program."
Tom brewmaster
Head Brewer & Co-Owner, Mountain Peak Brewing

Project Summary by Industry

Manufacturing Projects

Aerospace (Aurora):+73% storage
Electronics (CO Springs):+114% storage
Focus: High-capacity, compliance-ready systems

Distribution Projects

Food (Longmont):+74% storage
Auto Parts (Commerce City):+86% storage
Focus: Efficiency optimization, cost reduction

Specialty Projects

Brewing (Fort Collins):+147% storage
ROI:5 months
Focus: Custom solutions, rapid ROI

Geographic Coverage

Projects completed across Colorado Front Range: Denver Metro (Aurora, Commerce City), Boulder County (Longmont), Colorado Springs, and Fort Collins. Combined facility size: 443,000 square feet.

Key Project Insights

Storage Optimization Results

  • Average storage increase: 98.8% across all projects
  • Highest gain: 147% storage increase (Fort Collins brewery)
  • Operational efficiency improved 57.6% on average
  • Combined annual savings: $301,000 across all projects

Implementation Success Factors

  • Average project duration: 5.2 weeks
  • 100% on-time or early completion rate
  • Industry compliance maintained (AS9100, ISO 14644)
  • Average ROI achieved in 11.4 months

Frequently Asked Questions

What are typical results from warehouse storage optimization in Colorado?

Based on our 5 recent Colorado projects, clients see an average 98.8% storage capacity increase, $301,000 in annual savings, and ROI in 11.4 months. Projects range from aerospace manufacturing in Aurora to food distribution in Longmont, with storage improvements from 73% to 147% depending on existing layout and requirements.

How long do warehouse racking projects take to complete in Colorado?

Colorado warehouse projects typically take 3-8 weeks depending on complexity. Our Fort Collins brewery project took 3 weeks, while the Denver automotive consolidation required 8 weeks. Average project duration is 5.2 weeks including engineering, permitting, and installation phases.

What industries have you worked with for warehouse storage in Colorado?

We've completed projects across aerospace manufacturing (Aurora), food distribution (Longmont), automotive parts (Commerce City), electronics manufacturing (Colorado Springs), and craft brewing (Fort Collins). Each industry has specialized requirements we accommodate, from clean room compliance to cold storage optimization.

What is the typical ROI for warehouse storage improvements in Colorado?

Our Colorado projects show ROI ranging from 5-18 months, averaging 11.4 months. The Fort Collins brewery saw 5-month ROI through eliminated off-site storage costs, while the Denver aerospace project achieved 18-month ROI through operational efficiency gains and reduced labor costs.

Can you handle specialized storage requirements in Colorado warehouses?

Yes, we specialize in complex requirements: anti-static racking for aerospace components, galvanized systems for cold storage, clean room compatible stainless steel, and custom barrel storage solutions. Each Colorado project is engineered for specific operational and compliance requirements.

Ready to Achieve Similar Results for Your Colorado Warehouse?

Get a professional assessment and custom proposal based on your specific requirements. Free consultation and engineering review for qualified projects.